Most people asking how long an app takes are really asking when they can show it to their clients. The honest answer is a range, set mainly by what the app has to do, with a few fixed steps at the end that nobody can rush.
How long does it take to build an app?
Published guides give wide ranges, and most of them come from development firms describing their own way of working. Twine, a marketplace for hiring freelance developers, breaks a project into four phases and publishes a range for each:
| Stage | Twine's published range |
|---|---|
| Ideas and planning | 1 to 6 weeks |
| Design | 2 to 12 weeks |
| Development | 4 to 32 weeks |
| Testing and launch | 2 to 8 weeks |
Added together, that is roughly two months for the simplest app and more than a year for the largest. A small business usually wants something much narrower than a funded startup's product, so it should expect to sit near the shorter end.
How long does it take to build an app from scratch?
"From scratch" means designed and built for you, rather than assembled from a template. What stretches the schedule is the same list that stretches the price, which we cover in How much does it cost to build an app for my business?:
- Sign-in. Accounts mean passwords or email links, and a safe place to keep each person's information.
- Live information. Bookings, order status or messages need a back end, built and tested.
- Payments. Taking money adds security work and stricter store review.
- Platforms. iPhone and Android are two builds and two listings.
A visitor guide with your story, places, maps and contact buttons avoids most of these, which is why it is the quickest kind of app to make well.
How long does App Store and Google Play review take?
This is the part outside anyone's control, so it belongs in the plan from the first week.
Apple. App Review typically handles at least 50% of submissions in under 24 hours and 90% in under 48 hours. Incomplete submissions take longer or fail. Before any of that, the business needs an Apple developer account. A company must enroll with a D-U-N-S number; Apple advises allowing up to five business days to receive one from Dun & Bradstreet, then up to two more for Apple to receive it.
Google. Play Console reviews can take up to seven days, or longer in exceptional cases. There is also a rule that catches people out: a personal developer account created after November 13, 2023 must run a closed test with at least 12 testers, opted in for at least 14 days, before it can publish. Setting the account up in the business's name, as an organization, is the usual route for a company, and it keeps the listing yours.
How long does it take to build an app with AI?
Autocomplete shows plenty of people asking this, and AI builders really can produce a working draft in days. That is a fair way to test an idea. A business app that clients rely on still needs the slower parts: deciding what it should do, writing it in your voice, testing on real phones, the store listings and privacy pages, and review by Apple and Google. AI shortens the build. It does not shorten the decisions or the review queue. We set out when an app is worth having at all in Does my business need an app, or is a website enough?
What makes an app take longer than planned?
Much the same as a website. Features added halfway through, content that is not ready and several people approving every screen all add weeks. A store rejection adds a fix and a fresh review. Agreeing the feature list, who signs off, and who owns the developer accounts before work starts prevents most of it.
What should you ask a studio about timing?
- A start date and a store-submission date, with the stages between them.
- Whether the developer accounts are in your name, and who sets them up.
- Whether testing on Google Play's closed track is already in the schedule.
- What the studio needs from you, and by when.
- What happens to the date if the feature list changes.
- Can you try an app the studio has already built, on your own phone?
How we handle it
At Bay House Digital in Annapolis, every app ends in a fixed-price proposal with the schedule set out, store steps included. The iPhone App starts from $12,500 and iPhone and Android from $25,000; the full list is on our pricing page. You can try two apps we built, The Strohm House and Belly Rubs!, before you decide. For a website instead, see How long does it take to build a website?
Common questions
How long does it take to make an app?
It depends on scope more than anything. A guide-style app with a few screens and your own content sits at the short end; sign-in, payments and live data push it toward many months. Twine's published phase ranges add up to roughly two months for the simplest app and over a year for the largest.
How long should it take to build an app with AI?
AI builders can produce a first draft in days, which suits testing an idea. A finished business app still needs design, testing on real phones, store listings, privacy pages and review by Apple and Google, and none of that is instant. AI speeds up the build, not the decisions.
How long does Apple take to review an app?
Apple says App Review typically handles at least half of submissions in under 24 hours and 90% in under 48 hours. An incomplete submission can be delayed or rejected, so the listing, screenshots and privacy details should be ready before you submit.
